Skip to main content
  1. Home
  2. Computing
  3. News

Intel’s Whiskey Lake CPUs include hardware fix for Meltdown, Amber Lake does not

Add as a preferred source on Google
Image used with permission by copyright holder

Intel introduced new eighth-generation processors slated for laptops this week: Ultra-low power 15-watt “Whiskey Lake” U-series chips and extremely low power five-watt “Amber Lake” Y-series chips. After the launch, AnandTech asked Intel if these two processor families include hardware fixes for Meltdown and Spectre. The response was … rather loaded.

Meltdown and the two Spectre vulnerabilities are based on how processors “predict” the path of their current task, leaving sensitive data vulnerable in memory. Intel, hardware, and OS vendors began implementing fixes on a firmware and software level in early 2018. Intel also said that hardware mitigations would be introduced in new processors by the end of the year, hence the question.

Recommended Videos

For starters, the explanation will get somewhat technical. Although Intel releases “generations” of chips, they never rely on one single-generation design. Thus, each generation typically comprises of a refresh of a previous design, an entirely new design, and various design branches with different code names. All of this can get confusing so we’ll try to be clear as possible if you want to push forward.

First, Intel is gearing up to release 14nm processors based on its new “Cascade Lake” CPU design targeting servers and enthusiasts. A successor to Intel’s sixth-generation “Skylake-X” and “Skylake-SP” designs for those markets, these chips were originally slated to be the first to include hardware-based mitigations for Meltdown, Spectre, and Foreshadow. These chips will fall under Intel’s eighth-generation banner.

Meanwhile, Intel’s new Whiskey Lake chips released this week are based on the company’s original seventh-generation “Kaby Lake” design but uses the newer 14nm++ process node technology. As previously stated, these chips target laptops, requiring around 15 watts of power. Despite the seventh-generation foundation, Whiskey Lake CPUs also fall under the eighth-generation banner.

According to Intel, notebook-bound Whiskey Lake shares the same hardware fix for Meltdown as seen with server-bound Cascade Lake. These two families also share a hardware fix for the recently-disclosed L1 Terminal Fault issue, aka Foreshadow. But unlike Cascade Lake, Intel’s Whisky Lake design doesn’t include hardware fixes for Spectre Variant 2. All other issues are handled through firmware and OS fixes.

As for the new Amber Lake chips released this week, they’re based on Intel’s seventh-generation Kaby Lake design using 14nm+ process node technology. “Amber Lake” is similar to the “Kaby Lake Refresh” design introduced in the first wave of eighth-generation chips in August 2017. That said, all problems are handled through firmware and OS fixes, and do not contain hardware-based mitigations.

As a refresher, here are the three new Whiskey Lake processors:

i7-8565U i5-8265U i3-8145U
Cores: 4 4 2
Threads: 8 8 4
Base speed: 1.8GHz 1.6GHz 2.1GHz
Max speed: 4.6GHz 3.9GHz 3.9GHz
Cache: 8MB 6MB 4MB
Memory support: LPDDR3 @ 2,133MHz
DDR4 @ 2,400MHz
LPDDR3 @ 2,133MHz
DDR4 @ 2,400MHz
LPDDR3 @ 2,133MHz
DDR4 @ 2,400MHz
Power: 15W 15W 15W

Now here are the three new Amber Lake chips:

i7-8500Y i5-8200Y m3-8100Y
Cores: 2 2 2
Threads: 4 4 4
Base speed: 1.5GHz 1.3GHz 1.1GHz
Max speed: 4.2GHz 3.9GHz 3.4GHz
Cache: 4MB 4MB 4MB
Memory support: LPDDR3 @ 2,133MHz
DDR4 @ 2,400MHz
LPDDR3 @ 2,133MHz
DDR4 @ 2,400MHz
LPDDR3 @ 2,133MHz
DDR4 @ 2,400MHz
Power: 5W 5W 5W
Kevin Parrish
Kevin started taking PCs apart in the 90s when Quake was on the way and his PC lacked the required components. Since then…
Gemini will now take notes for you in Google Meet for you, if you the minimum $20 AI tax
Yet another Google subscription just dropped for Gemini
Google Meet Take Notes for me Gemini

Google has just released a useful Gemini feature, which you can try if you are a paying member of course. The company is now bringing "Take notes for me" for Gemini, which will be available in Google Meet for Google AI Pro and Google AI Ultra subscribers, along with eligible Workspace business customers.

For personal users, the feature starts with Google AI Pro, which costs $19.99 per month in the US. In other words, Gemini can now take your Google Meet notes, provided you pay the minimum AI tax.

Read more
After iPad Pro and MacBook Pro, the iMac could be the next in line for an OLED screen upgrade
iMac with M4

The iPhone got an OLED panel in 2017, while the iPad Pro followed in 2024. Even the MacBook Pro is expected to follow later this year or early next year. But what about the iMac?

According to TrendForce, the iMac could get an OLED upgrade. There's no timeline yet, but the direction is clear. Apple wants to replace its current display technologies with OLED, raising the bar for color quality for both regular users and professionals.

Read more
This $1,299 gaming PC wants to be a Steam Machine without waiting for Valve
Valve’s Steam Machine dream is already real in MetaPC's new prebuilt
MetaPC's Steamroller is a new Steam Machine rival

Valve’s Steam Machine may be the face of SteamOS, but the platform isn't exclusive to it. A big announcement after Steam Machine's unveiling was that SteamOS would be arriving on systems outside of the new hybrid console. Now, MetaPCs is one of the first to take advantage of this by opening the preorders for the Steamroller, a new prebuilt gaming desktop that ships with SteamOS installed by default.

Though Steamroller is not trying to be a tiny console-like cube. It is a normal desktop PC with standard parts and a real upgrade path. The system costs $1,299 and is listed with a preorder date of July 3, 2026.

Read more